Terracotta narratives logo mark.

CFG Fish Processing Facility

Canadian Fish Guys Inc.

January 2018 – September 2018

Narratives was responsible for compiling an environmental assessment report for licensing of a fish processing and packaging facility in Riverton, MB. The project will allow local fishermen to sell their fish to CFG and allow CFG to process and package fish for local and international markets in Europe and Far East Asia.

A bright orange and white fishing boat floats tied to a concrete dock. Orange and black buoys float a little ways from the boat. Power lines, metal poles, pulleys and the shoreline can be seen in the background.

Related Projects

A yellow CAT excavator sits beside a highway under construction. A smaller bulldozer sits to the left of it. Behind the machines sits large concrete pipes.

Highway 673 Improvement Project

Shoal Lake 40 First Nation

December 2020 – February 2021

A field with dried out yellow pea plants. The sky is blue with wisps of white clouds.

Portage Pea Project

Roquette Canada Ltd.

November 2016 – May 2017

July 2017 – May 2020

An Anishinaabe drum sits on a grassy field. In the foreground is a container for smudging. Empty chairs are in the background.

Harmonized Impact Assessment – Phase 2

Niiwin Wendaanimok Partnership

April 2020 – Current